Sistem Pengukuran Kinerja Supply Chain Management Pada Proyek Konstruksi

Main Article Content

Demi Ramadian
Elita Amrina

Keywords

Abstract

Construction project implementation process is often found inefficiency and problems at every stage of the construction process. Inefficiencies are caused because construction projects have high levels of fragmentation. The high level of fragmentation cannot be separated from the complexity and many work items on construction projects. To reduce the problem of inefficiencies in the implementation of construction projects required good supply chain management or better known as supply chain management (SCM) on construction projects. Therefore it is necessary to study the management of SCM in the construction project to reduce the inefficiency that occurred. SCM management of construction projects is done by designing SCM performance measurement systems in construction projects. This performance measurement system produces indicators that are combined with the Supply Chain Operation Reference (SCOR) method. So it helps in performing SCM performance measurement on construction projects. From the design results, obtained 14 SCM performance indicators on construction projects. The performance indicators are then used to perform SCM performance measurement of cement plant construction projects. From the measurement results obtained SCM performance value of 41 from a scale of 100. This shows the performance of SCM on construction projects for the construction of the cement plant is at a marginal level.

Downloads

Download data is not yet available.

References

[1]     Jurnal Ibukota. (2017). Sektor Konstruksi Tempati Posisi Ketiga Penyokong Pertumbuhan Ekonomi Indonesia 2016. 07 februari2017.https://jurnalibukota.wordpress.com/2017/02/10/sektor-konstruksi-tempati-posisi-ketiga-penyokong-pertumbuhan-ekonomi-indonesia-2016/. Diakses 13 April 2017.

[2]     Haridez.,Pangeran. (2012). Identifikasi Tingkat Kematangan Penerapan Supply Chain Konstruksi Pada PT X. Skripsi. Universitas Indonesia. Depok

[3]     Aditya,Kadek. (2017). Analisis Risiko Dalam Aliran Supply Chain Pada Proyek Konstruksi Gedung Di Bali. Jurnal Spektran, Vol5, No. 1, hal 1-87. https://doi.org/10.24843/SPEKTRAN.2017.v05.i01.p05.

[4]     Soepiadhy,Sutoyo. (2011). Pengaruh Rantai Pasok Terhadap Kinerja Kontraktor Bangunan Gedung di Jember. Prosiding Seminar Nasional Aplikasi Teknologi Prasarana Wilayah

[5]     Maddeppungeng, Andi. (2013). Analisis Kinerja Supply Chain Pada Proyek Konstruksi Bangunan Gedung.

[6]     Maghrizal, Aris. (2014). Analisis Pola dan Kinerja Supply Chain Pada Proyek Konstruksi Bangunan Perumahan. Jurnal Konstruksia, Vol. 5 no. 2

[7]     Wibowo, Agung. (2015). The Analysis of Supply Chain Performance Measurement at Construction Project. Procedia Engineering 125 (25-31). https://doi.org/10.1016/j.proeng.2015.11.005.

[8]     Wirahadikusumah, R.D. (2008). Pengembangan Indikator Kinerja Supply Chain Pada Proyek Konstruksi Bangunan Gedung. JurnalTeknologi, Edisi no.3, Tahun XXII

[9]     Supply Chain Council, Supply Chain Operation Reference- Model, Revision 11.0

[10]  Irvan, Muhammad. (2011). Implementasi Sistem Penilaian Kinerja Supply Chain Pada Perusahaan Stamping. Skripsi. Universitas Indonesia. Depok