Penjadwalan Mesin dengan Menggunakan Algoritma Pembangkitan Jadwal Aktif dan Algoritma Penjadwalan Non-Delay untuk Produk Hydrotiller dan Hammermil pada CV. Cherry Sarana Agro

Main Article Content

Prima Fithri
Fitri Ramawinta

Keywords

Abstract

Fulfillment of all demands of consumers who come to the product is one thing that always wanted to be achieved by a company. These requests are not independent of the company's ability to manufacture certain products. CV Cherry Sarana Agro manufactures a wide range of agricultural equipment, one of which is the product hydrotiller and hammermil. Demand for both products are always in large numbers for each period, however, the company could not meet the entire demand. One of the main factors that led this small company's production capacity for these two products is not optimal scheduling of machines made by companies, causing many to be a queue on a particular machine so that the total process operating time becomes very large. Scheduling method is used to optimize the scheduling of machines working on the report of this practice is actively scheduling method and the method of non-delay scheduling. The data needed to perform scheduling with both of these methods is the data used machines, data processing operations and data processing time of operation. With these three data, can be compared to the actual scheduling done by the company with the scheduling is done using active scheduling method and the method of non-delay scheduling. The most optimal scheduling is obtained after comparing the three methods used are scheduling using the non-delay scheduling. This method was chosen because the resulting make span is much smaller than the two other methods. This method is well applied in the company because in addition to reducing the total processing time, can also increase production capacity, so that all requests can be met.
Keywords: Active schedulling method, non-delay schedulling method, makespan, hydrotiller, hammermil

Downloads

Download data is not yet available.

References

[1] Aryono, Columbanus, 2011, Penjadwalan N Job M Mesin Dalam Proses Pembuatan Produk Ass Mesin Jahit Dan Baut Bearing Di PT. Sinar Sakti Matra Nusantara Bandung, Bandung, Unikom.
[2] Fogarty, Blackstone, Hoffman, 1991, Production and Inventory Management, Second Edition, South Western
[3] Ginting, Rosnani, 2009, Penjadwalan Mesin, Jakarta, Graha Ilmu.