[1]
Adrianto, W. and Kholil, M. 2016. Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA). Jurnal Optimasi Sistem Industri. 14, 2 (Apr. 2016), 299–309. DOI:https://doi.org/10.25077/josi.v14.n2.p299–309.2015.