[1]
Fajrah, N. and Noviardi, N. 2018. Analisis Performansi Mesin Pre-Turning dengan Metode Overall Equipment Effectiveness pada PT APCB. Jurnal Optimasi Sistem Industri. 17, 2 (Oct. 2018), 126–134. DOI:https://doi.org/10.25077/josi.v17.n2.p126-134.2018.