ADRIANTO, Wahyu; KHOLIL, Muhammad. Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA). Jurnal Optimasi Sistem Industri, [S. l.], v. 14, n. 2, p. 299–309, 2016. DOI: 10.25077/josi.v14.n2.p299–309.2015. Disponível em: https://josi.ft.unand.ac.id/index.php/josi/article/view/261. Acesso em: 11 mar. 2025.