ADRIANTO, W.; KHOLIL, M. Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA). Jurnal Optimasi Sistem Industri, Padang, ID, v. 14, n. 2, p. 299–309, 2016. DOI: 10.25077/josi.v14.n2.p299-309.2015. Disponível em: https://josi.ft.unand.ac.id/index.php/josi/article/view/14. Acesso em: 18 apr. 2024.