Prata, Bruno, Levi Ribeiro Abreu, and Marcelo Seido Nagano. (2022) 2022. “Total Tardiness Minimization in a Single-Machine With Periodical Resource Constraints”. Jurnal Optimasi Sistem Industri 21 (2). Padang, ID:97-105. https://doi.org/10.25077/josi.v21.n2.p97-105.2022.