Minimasi Waste dengan Pendekatan Value Stream Mapping

Main Article Content

Fandi Ahmad
Dimas Aditya

Keywords

engineering, industry, optimization,

Abstract

The problem that occurs in the packaging bottle production process is the amount of waste in it. Therefore, this study aims to make improvements in reducing waste of production time and provide recommendations for managing the production process so that in the future can be used as a reference in the production process optimization. The method used in this study is descriptive analysis conducted by examining the work and activities of an object. The results of the study show that in the production process, there was still a form of waste which, when viewed from the seven waste concept in the lean manufacturing system, there are some of the most dominant wastes such as inventory, waiting, process, overproduction, and defect. After improvement of the current mapping, the waste that occurs such as inventory, process, overproduction, waiting, and defects that occur in the production line reduced from the total lead time of 2.1 days with seven operators to 0.9 days with ten operators. Furthermore, the cycle time value of the current value stream mapping was 120.9 seconds, while the cycle time value of the proposed value stream mapping was 72 seconds. This shows an increase in productivity.

Downloads

Download data is not yet available.

References

[1]     W. Adrianto dan M. Kholil, “Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA),” Jurnal Optimasi Sistem Industri, vol. 14(2), pp. 299-309, 2015. https://doi.org/10.25077/josi.v14.n2.p299-309.2015.

[2]     C. H. Prasetyo dan P. A. Wicaksono, “Desain Perbaikan Untuk Meningkatkan Nilai Efisiensi Manufaktur Keberlanjutan Menggunakan Sustainable Value Stream Mapping (Studi Kasus : CV Mugiharjo), "Industrial Engineering Online Journal, vol. 7(4), pp. 1–7, 2019.

[3]     A. T. N. Huda, O. Novareza, dan D. P. Andriani, "Analisis Aktivitas Perawatan Mesin Hds Di Stasiun Gilingan Menggunakan Maintenance Value Stream Map (MVSM) (Studi Kasus PG. Kebon Agung Malang)," Jurnal Rekayasa dan Manajemen Sistem Industri, vol. 3(2), pp. 311-321, 2015.

[4]     W. Anggraini, M. Hutagalung, dan T. Nurainun, Value Stream Mapping Pada Proses Produksi Plywood Untuk Meningkatkan Process Cycle Efficiency. In Seminar Nasional Teknologi Informasi Komunikasi dan Industri, pp. 507-516, November 2018.

[5]     M. K. Mollah, M. Munir, dan A. W. Sari, Peningkatan Kualitas Pelayanan Dengan Metode Pendekatan Lean Service Di Perusahaan Jasa Transportasi  (Studi Kasus : PT. Kai Daop 8 Surabaya). In Seminar Nasional Sains dan Teknologi Terapan, vol. 6(1), pp. 593–598, 2018.

[6]     P. Solding dan P. Gullander, Concepts for simulation based value stream mapping. In Winter Simulation Conference, pp. 2231-2237, Desember 2009.

[7]     N. N. Warda, “Peningkatan Kualitas Gula Rafinasi Dengan Konsep Lean Manufacturing di PT Duta Sugar International, Tbk," Jurnal Industrial Services, vol. 1(1), pp. 158–163, 2015.

[8]     M. S. A. Khannan dan H. Haryono, “Analisis Penerapan Lean Manufacturing untuk Menghilangkan Pemborosan di Lini Produksi PT Adi Satria Abadi,” Jurnal Rekayasa Sistem Industri, vol. 4(1), pp. 47, 2017. https://doi.org/10.26593/jrsi.v4i1.1383.47-54.

[9]     J. M. Rohani dan S. M. Zahraee, “Production Line Analysis via Value Stream Mapping: A Lean Manufacturing Process of Color Industry,” Procedia Manufacturing, vol. 2, pp. 6-10, 2015. https://doi.org/10.1016/j.promfg.2015.07.002.

[10]   B. Haefner, A. Kraemer, T. Stauss, dan G. Lanza, “Quality value stream mapping,” Procedia CIRP, vol. 17, pp. 254-259, 2014. https://doi.org/10.1016/j.procir.2014.01.093.

[11]   D. T. Setiyawan, S. Soeparman, dan R. Soenoko, “Minimasi Waste Untuk Perbaikan Proses Produksi Kantong Kemasan,” Journal of Engineering and Management in Industrial System, vol. 1(1), 2013. https://doi.org/10.21776/ub.jemis.2013.001.01.2.

[12]   S. Vinodh, K. R. Arvind, dan M. Somanaathan, “Application of value stream mapping in an Indian camshaft manufacturing organisation,” Journal of Manufacturing Technology Management, vol. 21(7), pp. 888-900, 2010. https://doi.org/10.1108/17410381011077973.

 [13]  H. N. Sukma, E. Amrina, dan A. Hasan, “Evaluasi Proses Pelayanan Administrasi Kependudukan dengan Metode Lean Office,” Jurnal Optimasi Sistem Industri, vol. 17(2), pp. 171-187, 2018.  https://doi.org/10.25077/josi.v17.n2.p171-187.2018.

[14]   E. A. Mantiri, P. Kindangen, dan M. M. Karuntu, Pendekatan Lean Manufacturing Untuk Meningkatkan Efisiensi Dalam Proses Produksi Dengan Menggunakan Value Stream Mapping Pada CV. Indospice,” Jurnal EMBA: Jurnal Riset Ekonomi, Manajemen, Bisnis dan Akuntansi, vol. 5(2), pp. 1292–1300, 2017.

[15]   A. Murti, M. Marimin, dan Y. Arkeman, “Peningkatan Kinerja Karyawan Bagian Trade Operations Studi Kasus Bank OCBC NISP,” Jurnal Aplikasi Bisnis dan Manajemen (JABM), vol. 1(1), pp. 34–45, 2015. https://doi.org/10.17358/JABM.1.1.34.

 [16]  Y. C. Fernando dan S. Noya, “Optimasi Lini Produksi Dengan Value Stream Mapping dan Value Stream Analysis Tools,” Jurnal Ilmiah Teknik Industri, vol. 13(2), pp. 125–133, 2014.

Similar Articles

You may also start an advanced similarity search for this article.